Mountain Island BP
2211 Vinnie's Way, Charlotte, NC 28214
- Max power
- 400 kW
- Ultra-fast DC
- Charging ports
- 4
- CCS1, NACS
- Price
- Price not listed
- Per network listing
- Hours
- See hours
- Mon: 5:00am-12:00am; Tue: 5:00am-12:00am; Wed: 5:00am-12:00am; Thu: 5:00am-12:00am; Fri: 5:00am-12:00am; Sat: 5:00am-12:00am; Sun: 5:00am-12:00am
Mountain Island BP is a DC fast-charging station run by EV Connect at 2211 Vinnie's Way in Charlotte, NC. It has 4 charging ports with CCS1 and NACS connectors and delivers up to 400 kw. Pricing is set by the network app.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~90mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
3 ports · 400 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
NACS
1 port · 400 kW
DC fast
The North American Charging Standard, Tesla's plug, now adopted by most automakers.
Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.
Pricing
Price not listed
Prices can vary by time of day and membership. The EV Connect app shows the live rate before you start.
Location and access
- Address
- 2211 Vinnie's Way
Charlotte, NC 28214 - Coordinates
- 35.33671, -80.96217
- Hours
- Mon: 5:00am-12:00am; Tue: 5:00am-12:00am; Wed: 5:00am-12:00am; Thu: 5:00am-12:00am; Fri: 5:00am-12:00am; Sat: 5:00am-12:00am; Sun: 5:00am-12:00am
- Phone
- 866-816-7584
- Network
- EV Connect
Questions drivers ask
How fast is Mountain Island BP?
It delivers up to 400 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Mountain Island BP?
EV Connect has not published a fixed price for this site. Rates are shown in the EV Connect app or on the charger screen before you start a session.
What plugs does Mountain Island BP have?
3 × CCS1 (Combined Charging System) up to 400 kW; 1 × NACS (SAE J3400) up to 400 kW.
Is Mountain Island BP open 24/7?
Listed hours: Mon: 5:00am-12:00am; Tue: 5:00am-12:00am; Wed: 5:00am-12:00am; Thu: 5:00am-12:00am; Fri: 5:00am-12:00am; Sat: 5:00am-12:00am; Sun: 5:00am-12:00am.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 259544. Last confirmed by the network on Oct 11, 2026; opened Apr 18, 2023.