Atom Power HQ
13245 Reese Blvd W, Huntersville, NC 28078
- Max power
- Up to 7.2 kW
- Level 2
- Charging ports
- 4
- J1772
- Price
- Price not listed
- Per network listing
- Hours
- See hours
- Contact station for hours of availability
Atom Power HQ is a Level 2 station run by Ampup at 13245 Reese Blvd W in Huntersville, NC. It has 4 charging ports with J1772 connectors and delivers up to 7.2 kw. Pricing is set by the network app.
How long will charging take?
Range added per hour
~24mi
10% to 80%, 77 kWh battery
~8.3hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
4 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Ampup app shows the live rate before you start.
Location and access
- Address
- 13245 Reese Blvd W
Huntersville, NC 28078 - Coordinates
- 35.39256, -80.86521
- Hours
- Contact station for hours of availability
- Phone
- 860-490-4841
- Network
- Ampup
Questions drivers ask
How fast is Atom Power HQ?
It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Atom Power HQ?
Ampup has not published a fixed price for this site. Rates are shown in the Ampup app or on the charger screen before you start a session.
What plugs does Atom Power HQ have?
4 × J1772 (Type 1) up to 7 kW.
Is Atom Power HQ open 24/7?
Listed hours: Contact station for hours of availability.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 262122. Last confirmed by the network on Jun 12, 2023; opened Feb 6, 2023.