Skip to content
ChargePulse
High-power DC Independent

EV Edison Charging Hub

78 John Miller Way, Kearny, NJ 07032

Max power
180 kW
High-power DC
Charging ports
30
CCS1
Price
$0.47-0.63/kWh
Per network listing
Hours
24/7
Open all day

EV Edison Charging Hub is a DC fast-charging station run by Independent at 78 John Miller Way in Kearny, NJ. It has 30 charging ports with CCS1 connectors and delivers up to 180 kw. Listed pricing is $0.47-0.63/kWh, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~90mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

30 ports · 180 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

$0.47-0.63/kWh

Network listing: “12am-6am $0.47 per kWh, 6am-12pm $0.55 per kWh, 12pm-11pm $0.63 per kWh, 11pm-12am $0.55 per kWh; Idle fee $0.40 per minute”

A 10% to 80% session (about 54 kWh) costs roughly $25.33 to $33.96 before taxes and idle fees.

Location and access

Address
78 John Miller Way
Kearny, NJ 07032
Coordinates
40.72448, -74.10953
Hours
24/7Also accepts Google Pay
On site
24/7 Access

Questions drivers ask

How fast is EV Edison Charging Hub?

It delivers up to 180 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at EV Edison Charging Hub?

The listed rate is $0.47-0.63/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $25 to $34 before taxes and idle fees.

What plugs does EV Edison Charging Hub have?

30 × CCS1 (Combined Charging System) up to 180 kW.

Is EV Edison Charging Hub open 24/7?

Yes, the network lists it as open 24 hours a day. Note: Also accepts Google Pay.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 450926. Last confirmed by the network on Apr 14, 2026; opened Jun 24, 2025.