Skip to content
ChargePulse
DC fast ChargePoint

Hudson Toyota CPE250 #2

617 NJ-440, Jersey City, NJ 07305

Max power
125 kW
DC fast
Charging ports
1
CCS1, CHAdeMO
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Hudson Toyota CPE250 #2 is a DC fast-charging station run by ChargePoint at 617 NJ-440 in Jersey City, NJ. It has 1 charging port with CCS1 and CHAdeMO connectors and delivers up to 125 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~42min

Range added in 15 minutes

~64mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 125 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

1 port · 125 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
617 NJ-440
Jersey City, NJ 07305
Coordinates
40.71745, -74.09601
Finding the chargers
Service Drive Entrance
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is Hudson Toyota CPE250 #2?

It delivers up to 125 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 42 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Hudson Toyota CPE250 #2?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does Hudson Toyota CPE250 #2 have?

1 × CHAdeMO up to 125 kW; 1 × CCS1 (Combined Charging System) up to 125 kW.

Is Hudson Toyota CPE250 #2 open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 238873. Last confirmed by the network on Oct 11, 2026; opened Dec 29, 2022.