Skip to content
ChargePulse
DC fast Blink Temporarily unavailable

Jensen Buick GMC

2525 S Broadway St, New Ulm, MN 56073

Max power
60 kW
DC fast
Charging ports
2
CCS1
Price
Free
No charging fee listed
Hours
24/7
Open all day

Jensen Buick GMC is a DC fast-charging station run by Blink at 2525 S Broadway St in New Ulm, MN. It has 2 charging ports with CCS1 connectors and delivers up to 60 kw. Charging is free, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~63min

Range added in 15 minutes

~42mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 60 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Free

Network listing: “Free”

Location and access

Address
2525 S Broadway St
New Ulm, MN 56073
Coordinates
44.28542, -94.43532
Hours
24/7
Network
Blink
On site
24/7 Access

Questions drivers ask

How fast is Jensen Buick GMC?

It delivers up to 60 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 63 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Jensen Buick GMC?

Charging is listed as free. Parking fees or time limits may still apply.

What plugs does Jensen Buick GMC have?

2 × CCS1 (Combined Charging System) up to 60 kW.

Is Jensen Buick GMC open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 228900. Last confirmed by the network on Oct 11, 2026; opened Sep 22, 2022.