City of New Ulm
541 2nd Street North, New Ulm, MN 56073
- Max power
- 50 kW
- DC fast
- Charging ports
- 4
- CCS1, CHAdeMO, J1772
- Price
- Price not listed
- Per network listing
- Hours
- Not listed
- Check before you go
City of New Ulm is a DC fast-charging station run by Zefnet at 541 2nd Street North in New Ulm, MN. It has 4 charging ports with CCS1, CHAdeMO and J1772 connectors and delivers up to 50 kw. Pricing is set by the network app.
How long will charging take?
10% to 80%, 77 kWh battery
~76min
Range added in 15 minutes
~35mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CHAdeMO
1 port · 50 kW
DC fast
An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.
Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.
CCS1
1 port · 50 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
J1772
2 ports · 12 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Zefnet app shows the live rate before you start.
Location and access
- Address
- 541 2nd Street North
New Ulm, MN 56073 - Coordinates
- 44.31495, -94.46152
- Hours
- Not listed
- Phone
- 888-493-3638
- Network
- Zefnet
Questions drivers ask
How fast is City of New Ulm?
It delivers up to 50 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at City of New Ulm?
Zefnet has not published a fixed price for this site. Rates are shown in the Zefnet app or on the charger screen before you start a session.
What plugs does City of New Ulm have?
1 × CHAdeMO up to 50 kW; 1 × CCS1 (Combined Charging System) up to 50 kW; 2 × J1772 (Type 1) up to 12 kW.
Is City of New Ulm open 24/7?
Hours are not listed. Access may follow the host location's opening hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 332413. Last confirmed by the network on Oct 11, 2026; opened Apr 16, 2024.