Skip to content
ChargePulse
DC fast Zefnet

Blooming Prairie City Hall

138 Highway Avenue South, Blooming Prairie, MN 55917

Max power
50 kW
DC fast
Charging ports
4
CCS1, CHAdeMO, J1772
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Blooming Prairie City Hall is a DC fast-charging station run by Zefnet at 138 Highway Avenue South in Blooming Prairie, MN. It has 4 charging ports with CCS1, CHAdeMO and J1772 connectors and delivers up to 50 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~76min

Range added in 15 minutes

~35mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 50 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

1 port · 50 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

2 ports · 12 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Zefnet app shows the live rate before you start.

Location and access

Address
138 Highway Avenue South
Blooming Prairie, MN 55917
Coordinates
43.86582, -93.04924
Hours
Not listed
Network
Zefnet

Questions drivers ask

How fast is Blooming Prairie City Hall?

It delivers up to 50 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Blooming Prairie City Hall?

Zefnet has not published a fixed price for this site. Rates are shown in the Zefnet app or on the charger screen before you start a session.

What plugs does Blooming Prairie City Hall have?

1 × CHAdeMO up to 50 kW; 1 × CCS1 (Combined Charging System) up to 50 kW; 2 × J1772 (Type 1) up to 12 kW.

Is Blooming Prairie City Hall open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 256086. Last confirmed by the network on Oct 11, 2026; opened Mar 9, 2023.