Austin Ford Jeep
2701 Oakland Ave W, Austin, MN 55912
- Max power
- 96 kW
- DC fast
- Charging ports
- 8
- CCS1, J1772
- Price
- Price not listed
- Per network listing
- Hours
- Not listed
- Check before you go
Austin Ford Jeep is a DC fast-charging station run by Red E at 2701 Oakland Ave W in Austin, MN. It has 8 charging ports with CCS1 and J1772 connectors and delivers up to 96 kw. Pricing is set by the network app.
How long will charging take?
10% to 80%, 77 kWh battery
~54min
Range added in 15 minutes
~49mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
4 ports · 96 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
J1772
4 ports · 19 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Red E app shows the live rate before you start.
Location and access
- Address
- 2701 Oakland Ave W
Austin, MN 55912 - Coordinates
- 43.66627, -93.01254
- Hours
- Not listed
- Phone
- 313-262-6722
- Network
- Red E
Questions drivers ask
How fast is Austin Ford Jeep?
It delivers up to 96 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 54 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Austin Ford Jeep?
Red E has not published a fixed price for this site. Rates are shown in the Red E app or on the charger screen before you start a session.
What plugs does Austin Ford Jeep have?
4 × CCS1 (Combined Charging System) up to 96 kW; 4 × J1772 (Type 1) up to 19 kW.
Is Austin Ford Jeep open 24/7?
Hours are not listed. Access may follow the host location's opening hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 351681. Last confirmed by the network on Oct 11, 2026; opened Jul 10, 2024.