Skip to content
ChargePulse
DC fast ChargePoint

Wrdsb Lackner PS

151 Zeller Dr, Kitchener, ON N2A 4H4

Max power
9.6 kW
DC fast
Charging ports
2
J1772, NACS
Price
Price not listed
Per network listing
Hours
See hours
Mon: 4:00pm-11:59pm; Tue: 4:00pm-11:59pm; Wed: 4:00pm-11:59pm; Thu: 4:00pm-11:59pm; Fri: 4:00pm-11:59pm; Sat: 4:00pm-11:59pm; Sun: 4:00pm-11:59pm

Wrdsb Lackner PS is a DC fast-charging station run by ChargePoint at 151 Zeller Dr in Kitchener, ON. It has 2 charging ports with J1772 and NACS connectors and delivers up to 9.6 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~396min

Range added in 15 minutes

~11km

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

NACS

2 ports · 10 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

J1772

2 ports · 10 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
151 Zeller Dr
Kitchener, ON N2A 4H4
Coordinates
43.45232, -80.41898
Hours
Mon: 4:00pm-11:59pm; Tue: 4:00pm-11:59pm; Wed: 4:00pm-11:59pm; Thu: 4:00pm-11:59pm; Fri: 4:00pm-11:59pm; Sat: 4:00pm-11:59pm; Sun: 4:00pm-11:59pm

Questions drivers ask

How fast is Wrdsb Lackner PS?

It delivers up to 10 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 396 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Wrdsb Lackner PS?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does Wrdsb Lackner PS have?

2 × NACS (SAE J3400) up to 10 kW; 2 × J1772 (Type 1) up to 10 kW.

Is Wrdsb Lackner PS open 24/7?

Listed hours: Mon: 4:00pm-11:59pm; Tue: 4:00pm-11:59pm; Wed: 4:00pm-11:59pm; Thu: 4:00pm-11:59pm; Fri: 4:00pm-11:59pm; Sat: 4:00pm-11:59pm; Sun: 4:00pm-11:59pm.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 466783. Last confirmed by the network on Oct 10, 2026; opened Aug 27, 2026.