Regional Municipality of Waterloo
1-4881 Fountain St N, Breslau, ON N0B 1M0
- Max power
- Up to 7.2 kW
- Level 2
- Charging ports
- 4
- J1772
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
Regional Municipality of Waterloo is a Level 2 station run by Independent at 1-4881 Fountain St N in Breslau, ON. It has 4 charging ports with J1772 connectors and delivers up to 7.2 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
Range added per hour
~39km
10% to 80%, 77 kWh battery
~8.3hours
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
J1772
4 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Independent app shows the live rate before you start.
Location and access
- Address
- 1-4881 Fountain St N
Breslau, ON N0B 1M0 - Coordinates
- 43.46680, -80.41638
- Hours
- 24/7
- On site
- 24/7 Access
Questions drivers ask
How fast is Regional Municipality of Waterloo?
It is a Level 2 station delivering up to 7 kW, which adds roughly 24 miles of range per hour. It suits charging while you shop, work or stay overnight rather than a quick road-trip stop.
How much does it cost to charge at Regional Municipality of Waterloo?
Independent has not published a fixed price for this site. Rates are shown in the Independent app or on the charger screen before you start a session.
What plugs does Regional Municipality of Waterloo have?
4 × J1772 (Type 1) up to 7 kW.
Is Regional Municipality of Waterloo open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 464682. Last confirmed by the network on Sep 15, 2026; opened Mar 18, 2022.