Skip to content
ChargePulse
High-power DC Red E

Sedro Woolley ROW

900 Metcalf St, Sedro Woolley, WA 98284

Max power
200.2 kW
High-power DC
Charging ports
8
CCS1, CHAdeMO
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Sedro Woolley ROW is a DC fast-charging station run by Red E at 900 Metcalf St in Sedro Woolley, WA. It has 8 charging ports with CCS1 and CHAdeMO connectors and delivers up to 200.2 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~90mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 62 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

7 ports · 200 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The Red E app shows the live rate before you start.

Location and access

Address
900 Metcalf St
Sedro Woolley, WA 98284
Coordinates
48.50274, -122.23904
Hours
Not listed
Network
Red E

Questions drivers ask

How fast is Sedro Woolley ROW?

It delivers up to 200 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Sedro Woolley ROW?

Red E has not published a fixed price for this site. Rates are shown in the Red E app or on the charger screen before you start a session.

What plugs does Sedro Woolley ROW have?

1 × CHAdeMO up to 62 kW; 7 × CCS1 (Combined Charging System) up to 200 kW.

Is Sedro Woolley ROW open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 456455. Last confirmed by the network on Oct 11, 2026; opened Mar 23, 2026.