Ford of Kirkland
11800 124th Avenue Northeast, Kirkland, WA 98034
- Max power
- 300 kW
- Ultra-fast DC
- Charging ports
- 8
- CCS1, J1772
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
Ford of Kirkland is a DC fast-charging station run by Blink at 11800 124th Avenue Northeast in Kirkland, WA. It has 8 charging ports with CCS1 and J1772 connectors and delivers up to 300 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~90mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
4 ports · 300 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
J1772
4 ports · 17 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Blink app shows the live rate before you start.
Location and access
- Address
- 11800 124th Avenue Northeast
Kirkland, WA 98034 - Coordinates
- 47.70638, -122.17511
- Hours
- 24/7
- Phone
- 888-998-2546
- Network
- Blink
- On site
- 24/7 Access
Questions drivers ask
How fast is Ford of Kirkland?
It delivers up to 300 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Ford of Kirkland?
Blink has not published a fixed price for this site. Rates are shown in the Blink app or on the charger screen before you start a session.
What plugs does Ford of Kirkland have?
4 × CCS1 (Combined Charging System) up to 300 kW; 4 × J1772 (Type 1) up to 17 kW.
Is Ford of Kirkland open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 397982. Last confirmed by the network on Oct 11, 2026; opened Jun 6, 2025.