Skip to content
ChargePulse
High-power DC Evcs

Greenbank Farm

765 Wonn Road, Greenbank, WA 98253

Max power
180 kW
High-power DC
Charging ports
12
CCS1, J1772
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Greenbank Farm is a DC fast-charging station run by Evcs at 765 Wonn Road in Greenbank, WA. It has 12 charging ports with CCS1 and J1772 connectors and delivers up to 180 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~90mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

6 ports · 180 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

6 ports · 8 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Evcs app shows the live rate before you start.

Location and access

Address
765 Wonn Road
Greenbank, WA 98253
Coordinates
48.10545, -122.57307
Hours
Not listed
Network
Evcs

Questions drivers ask

How fast is Greenbank Farm?

It delivers up to 180 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Greenbank Farm?

Evcs has not published a fixed price for this site. Rates are shown in the Evcs app or on the charger screen before you start a session.

What plugs does Greenbank Farm have?

6 × CCS1 (Combined Charging System) up to 180 kW; 6 × J1772 (Type 1) up to 8 kW.

Is Greenbank Farm open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 465382. Last confirmed by the network on Oct 11, 2026; opened Jul 31, 2026.