Skip to content
ChargePulse
DC fast ChargePoint

Summit EV STATION2

38 Sykes Mountain Ave, Hartford, VT 05001

Max power
102.5 kW
DC fast
Charging ports
1
CCS1, CHAdeMO
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Summit EV STATION2 is a DC fast-charging station run by ChargePoint at 38 Sykes Mountain Ave in Hartford, VT. It has 1 charging port with CCS1 and CHAdeMO connectors and delivers up to 102.5 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~51min

Range added in 15 minutes

~52mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 103 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

1 port · 102 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
38 Sykes Mountain Ave
Hartford, VT 05001
Coordinates
43.64681, -72.33449
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is Summit EV STATION2?

It delivers up to 103 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 51 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Summit EV STATION2?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does Summit EV STATION2 have?

1 × CHAdeMO up to 103 kW; 1 × CCS1 (Combined Charging System) up to 102 kW.

Is Summit EV STATION2 open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 206750. Last confirmed by the network on Oct 11, 2026; opened Feb 19, 2022.