Skip to content
ChargePulse
DC fast Chargelab

Chargelab at 61 S Main St

61 S Main St, St. George, UT 84770

Max power
40 kW
DC fast
Charging ports
5
CCS1, J1772
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Chargelab at 61 S Main St is a DC fast-charging station run by Chargelab at 61 S Main St in St. George, UT. It has 5 charging ports with CCS1 and J1772 connectors and delivers up to 40 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~95min

Range added in 15 minutes

~28mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

1 port · 40 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

4 ports · 19 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Chargelab app shows the live rate before you start.

Location and access

Address
61 S Main St
St. George, UT 84770
Coordinates
37.10707, -113.58333
Hours
Not listed
Network
Chargelab

Questions drivers ask

How fast is Chargelab at 61 S Main St?

It delivers up to 40 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 95 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Chargelab at 61 S Main St?

Chargelab has not published a fixed price for this site. Rates are shown in the Chargelab app or on the charger screen before you start a session.

What plugs does Chargelab at 61 S Main St have?

1 × CCS1 (Combined Charging System) up to 40 kW; 4 × J1772 (Type 1) up to 19 kW.

Is Chargelab at 61 S Main St open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 455732. Last confirmed by the network on Oct 11, 2026; opened Mar 18, 2026.