DCFC Level 3 Hyper Charger
8700 Fourwinds Dr, Windcrest, TX 78239
- Max power
- 180 kW
- High-power DC
- Charging ports
- 2
- CCS1, NACS
- Price
- $0.30/kWh
- Per network listing
- Hours
- 24/7
- Open all day
DCFC Level 3 Hyper Charger is a DC fast-charging station run by Independent at 8700 Fourwinds Dr in Windcrest, TX. It has 2 charging ports with CCS1 and NACS connectors and delivers up to 180 kw. Listed pricing is $0.30/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~90mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
1 port · 180 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
NACS
1 port · 180 kW
DC fast
The North American Charging Standard, Tesla's plug, now adopted by most automakers.
Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.
Pricing
$0.30/kWh
Network listing: “$0.30 per kWh”
A 10% to 80% session (about 54 kWh) costs roughly $16.17 before taxes and idle fees.
Location and access
- Address
- 8700 Fourwinds Dr
Windcrest, TX 78239 - Coordinates
- 29.51860, -98.39383
- Hours
- 24/7
- Phone
- 210-392-0036
- On site
- 24/7 Access
Questions drivers ask
How fast is DCFC Level 3 Hyper Charger?
It delivers up to 180 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at DCFC Level 3 Hyper Charger?
The listed rate is $0.30/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $16 before taxes and idle fees.
What plugs does DCFC Level 3 Hyper Charger have?
1 × CCS1 (Combined Charging System) up to 180 kW; 1 × NACS (SAE J3400) up to 180 kW.
Is DCFC Level 3 Hyper Charger open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 450984. Last confirmed by the network on Mar 12, 2026; opened Jan 6, 2026.