Skip to content
ChargePulse
High-power DC Synergev Temporarily unavailable

Synergev at 2401 E Expressway 83

2401 E Expressway 83, Weslaco, TX 78599

Max power
180 kW
High-power DC
Charging ports
2
CCS1
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Synergev at 2401 E Expressway 83 is a DC fast-charging station run by Synergev at 2401 E Expressway 83 in Weslaco, TX. It has 2 charging ports with CCS1 connectors and delivers up to 180 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~90mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

4 ports · 180 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The Synergev app shows the live rate before you start.

Location and access

Address
2401 E Expressway 83
Weslaco, TX 78599
Coordinates
26.16746, -97.96745
Hours
24/7
Network
Synergev
On site
24/7 Access

Questions drivers ask

How fast is Synergev at 2401 E Expressway 83?

It delivers up to 180 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Synergev at 2401 E Expressway 83?

Synergev has not published a fixed price for this site. Rates are shown in the Synergev app or on the charger screen before you start a session.

What plugs does Synergev at 2401 E Expressway 83 have?

4 × CCS1 (Combined Charging System) up to 180 kW.

Is Synergev at 2401 E Expressway 83 open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 452431. Last confirmed by the network on Oct 11, 2026; opened Mar 4, 2026.