Skip to content
ChargePulse
DC fast In Charge

Tishomingo Chevrolet

1120 W Main St, Tishomingo, OK 73460

Max power
63 kW
DC fast
Charging ports
2
CCS1
Price
$0.60/kWh
Per network listing
Hours
See hours
8am-5pm M-F, 8am-12pm Sat

Tishomingo Chevrolet is a DC fast-charging station run by In Charge at 1120 W Main St in Tishomingo, OK. It has 2 charging ports with CCS1 connectors and delivers up to 63 kw. Listed pricing is $0.60/kWh, and the site is open 8am-5pm M-F, 8am-12pm Sat.

How long will charging take?

10% to 80%, 77 kWh battery

~83min

Range added in 15 minutes

~32mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 63 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

$0.60/kWh

Network listing: “$0.60 per kWh”

A 10% to 80% session (about 54 kWh) costs roughly $32.34 before taxes and idle fees.

Location and access

Address
1120 W Main St
Tishomingo, OK 73460
Coordinates
34.24064, -96.69023
Hours
8am-5pm M-F, 8am-12pm Sat
Network
In Charge
On site
Restrooms

Questions drivers ask

How fast is Tishomingo Chevrolet?

It delivers up to 63 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 83 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Tishomingo Chevrolet?

The listed rate is $0.60/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $32 before taxes and idle fees.

What plugs does Tishomingo Chevrolet have?

2 × CCS1 (Combined Charging System) up to 63 kW.

Is Tishomingo Chevrolet open 24/7?

Listed hours: 8am-5pm M-F, 8am-12pm Sat.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 461316. Last confirmed by the network on Jul 15, 2026; opened Jan 1, 2025.