Skip to content
ChargePulse
High-power DC Fcn

Joe Cooper Ford of Edmond

600 W Memorial Rd, Oklahoma City, OK 73114

Max power
150 kW
High-power DC
Charging ports
7
CCS1, CHAdeMO, J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Joe Cooper Ford of Edmond is a DC fast-charging station run by Fcn at 600 W Memorial Rd in Oklahoma City, OK. It has 7 charging ports with CCS1, CHAdeMO and J1772 connectors and delivers up to 150 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~35min

Range added in 15 minutes

~77mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 80 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

1 port · 150 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

5 ports · 17 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Fcn app shows the live rate before you start.

Location and access

Address
600 W Memorial Rd
Oklahoma City, OK 73114
Coordinates
35.60832, -97.52388
Hours
24/7
Network
Fcn
On site
24/7 Access

Questions drivers ask

How fast is Joe Cooper Ford of Edmond?

It delivers up to 150 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 35 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Joe Cooper Ford of Edmond?

Fcn has not published a fixed price for this site. Rates are shown in the Fcn app or on the charger screen before you start a session.

What plugs does Joe Cooper Ford of Edmond have?

1 × CHAdeMO up to 80 kW; 1 × CCS1 (Combined Charging System) up to 150 kW; 5 × J1772 (Type 1) up to 17 kW.

Is Joe Cooper Ford of Edmond open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 357801. Last confirmed by the network on Oct 11, 2026; opened Oct 10, 2024.