Jeff Wyler Honda - Colerain
8950 Colerain Ave, Cincinnati, OH 45251
- Max power
- 20 kW
- DC fast
- Charging ports
- 1
- CCS1
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
Jeff Wyler Honda - Colerain is a DC fast-charging station run by Independent at 8950 Colerain Ave in Cincinnati, OH. It has 1 charging port with CCS1 connectors and delivers up to 20 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~190min
Range added in 15 minutes
~14mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
1 port · 20 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Price not listed
Prices can vary by time of day and membership. The Independent app shows the live rate before you start.
Location and access
- Address
- 8950 Colerain Ave
Cincinnati, OH 45251 - Coordinates
- 39.23431, -84.59037
- Hours
- 24/7
- Phone
- 513-741-3700
- On site
- Restrooms24/7 Access
Questions drivers ask
How fast is Jeff Wyler Honda - Colerain?
It delivers up to 20 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 190 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Jeff Wyler Honda - Colerain?
Independent has not published a fixed price for this site. Rates are shown in the Independent app or on the charger screen before you start a session.
What plugs does Jeff Wyler Honda - Colerain have?
1 × CCS1 (Combined Charging System) up to 20 kW.
Is Jeff Wyler Honda - Colerain open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 463331. Last confirmed by the network on Jul 15, 2026; opened Oct 10, 2025.