New Hyundai Hyundai Side
2421 N Main St, High Point, NC 27262
- Max power
- 62.5 kW
- DC fast
- Charging ports
- 1
- CCS1, CHAdeMO
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
New Hyundai Hyundai Side is a DC fast-charging station run by ChargePoint at 2421 N Main St in High Point, NC. It has 1 charging port with CCS1 and CHAdeMO connectors and delivers up to 62.5 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~61min
Range added in 15 minutes
~44mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CHAdeMO
1 port · 63 kW
DC fast
An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.
Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.
CCS1
1 port · 62 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Price not listed
Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.
Location and access
- Address
- 2421 N Main St
High Point, NC 27262 - Coordinates
- 35.98791, -80.02674
- Hours
- 24/7
- Phone
- 888-758-4389
- Network
- ChargePoint
- On site
- 24/7 Access
Questions drivers ask
How fast is New Hyundai Hyundai Side?
It delivers up to 63 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 61 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at New Hyundai Hyundai Side?
ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.
What plugs does New Hyundai Hyundai Side have?
1 × CHAdeMO up to 63 kW; 1 × CCS1 (Combined Charging System) up to 62 kW.
Is New Hyundai Hyundai Side open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 256800. Last confirmed by the network on Oct 11, 2026; opened Mar 21, 2023.