Sal Mineo Nissan - New Rochelle
2533 Palmer Ave, New Rochelle, NY 10801
- Max power
- 54 kW
- DC fast
- Charging ports
- 2
- CCS1, CHAdeMO
- Price
- $0.50/kWh
- Per network listing
- Hours
- 24/7
- Open all day
Sal Mineo Nissan - New Rochelle is a DC fast-charging station run by Nayax Energy at 2533 Palmer Ave in New Rochelle, NY. It has 2 charging ports with CCS1 and CHAdeMO connectors and delivers up to 54 kw. Listed pricing is $0.50/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~70min
Range added in 15 minutes
~38mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CHAdeMO
2 ports · 50 kW
DC fast
An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.
Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.
CCS1
2 ports · 54 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
$0.50/kWh
Network listing: “$0.50 per kWh + $1 connection”
A 10% to 80% session (about 54 kWh) costs roughly $26.95 before taxes and idle fees.
Location and access
- Address
- 2533 Palmer Ave
New Rochelle, NY 10801 - Coordinates
- 40.91921, -73.77700
- Hours
- 24/7
- Phone
- 914-576-7600
- Network
- Nayax Energy
- On site
- Restrooms24/7 Access
Questions drivers ask
How fast is Sal Mineo Nissan - New Rochelle?
It delivers up to 54 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 70 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Sal Mineo Nissan - New Rochelle?
The listed rate is $0.50/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $27 before taxes and idle fees.
What plugs does Sal Mineo Nissan - New Rochelle have?
2 × CHAdeMO up to 50 kW; 2 × CCS1 (Combined Charging System) up to 54 kW.
Is Sal Mineo Nissan - New Rochelle open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 448713. Last confirmed by the network on Jan 13, 2026; opened Jan 1, 2025.