New Baltimore NB Travel Plaza
Milepost 127 S NY State Thruway, New Baltimore, NY 12124
- Max power
- 250 kW
- High-power DC
- Charging ports
- 4
- CCS1, CHAdeMO, NACS
- Price
- $0.64/kWh
- Per network listing
- Hours
- 24/7
- Open all day
New Baltimore NB Travel Plaza is a DC fast-charging station run by Applegreen at Milepost 127 S NY State Thruway in New Baltimore, NY. It has 4 charging ports with CCS1, CHAdeMO and NACS connectors and delivers up to 250 kw. Listed pricing is $0.64/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~90mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CHAdeMO
3 ports · 50 kW
DC fast
An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.
Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.
CCS1
3 ports · 250 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
NACS
1 port · 250 kW
DC fast
The North American Charging Standard, Tesla's plug, now adopted by most automakers.
Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.
Pricing
$0.64/kWh
Network listing: “$0.64 per kWh”
A 10% to 80% session (about 54 kWh) costs roughly $34.50 before taxes and idle fees.
Location and access
- Address
- Milepost 127 S NY State Thruway
New Baltimore, NY 12124 - Coordinates
- 42.42857, -73.80558
- Hours
- 24/7
- Phone
- 888-557-7099
- Network
- Applegreen
- On site
- RestroomsFood / RestaurantsConvenience Store24/7 Access
Questions drivers ask
How fast is New Baltimore NB Travel Plaza?
It delivers up to 250 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at New Baltimore NB Travel Plaza?
The listed rate is $0.64/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $34 before taxes and idle fees.
What plugs does New Baltimore NB Travel Plaza have?
3 × CHAdeMO up to 50 kW; 3 × CCS1 (Combined Charging System) up to 250 kW; 1 × NACS (SAE J3400) up to 250 kW.
Is New Baltimore NB Travel Plaza open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 356179. Last confirmed by the network on Mar 12, 2026; opened Sep 23, 2024.