Skip to content
ChargePulse
DC fast Red E

Red River Conference Center

101 River St, Red River, NM 87558

Max power
50.4 kW
DC fast
Charging ports
3
CCS1, J1772
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Red River Conference Center is a DC fast-charging station run by Red E at 101 River St in Red River, NM. It has 3 charging ports with CCS1 and J1772 connectors and delivers up to 50.4 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~75min

Range added in 15 minutes

~35mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 50 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

1 port · 8 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Red E app shows the live rate before you start.

Location and access

Address
101 River St
Red River, NM 87558
Coordinates
36.70733, -105.40714
Hours
Not listed
Network
Red E

Questions drivers ask

How fast is Red River Conference Center?

It delivers up to 50 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 75 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Red River Conference Center?

Red E has not published a fixed price for this site. Rates are shown in the Red E app or on the charger screen before you start a session.

What plugs does Red River Conference Center have?

2 × CCS1 (Combined Charging System) up to 50 kW; 1 × J1772 (Type 1) up to 8 kW.

Is Red River Conference Center open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 250706. Last confirmed by the network on Oct 11, 2026; opened Jan 11, 2023.