Abq Cell Lot Powerlink-2
2325 Sunport Loop Southeast, Albuquerque, NM 87106
- Max power
- 120 kW
- DC fast
- Charging ports
- 2
- CCS1, NACS
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
Abq Cell Lot Powerlink-2 is a DC fast-charging station run by ChargePoint at 2325 Sunport Loop Southeast in Albuquerque, NM. It has 2 charging ports with CCS1 and NACS connectors and delivers up to 120 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~43min
Range added in 15 minutes
~61mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
2 ports · 120 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
NACS
2 ports · 120 kW
DC fast
The North American Charging Standard, Tesla's plug, now adopted by most automakers.
Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.
Pricing
Price not listed
Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.
Location and access
- Address
- 2325 Sunport Loop Southeast
Albuquerque, NM 87106 - Coordinates
- 35.05065, -106.61976
- Finding the chargers
- Sunport Cell Phone Lot
- Hours
- 24/7
- Phone
- 888-758-4389
- Network
- ChargePoint
- On site
- 24/7 Access
Questions drivers ask
How fast is Abq Cell Lot Powerlink-2?
It delivers up to 120 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 43 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Abq Cell Lot Powerlink-2?
ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.
What plugs does Abq Cell Lot Powerlink-2 have?
2 × CCS1 (Combined Charging System) up to 120 kW; 2 × NACS (SAE J3400) up to 120 kW.
Is Abq Cell Lot Powerlink-2 open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 458450. Last confirmed by the network on Oct 10, 2026; opened Apr 30, 2026.