Vince Lombardi Service Plaza
116 E New Jersey Turnpike, Ridgefield, NJ 07657
- Max power
- 400 kW
- Ultra-fast DC
- Charging ports
- 8
- CCS1
- Price
- $0.58/kWh
- Per network listing
- Hours
- 24/7
- Open all day
Vince Lombardi Service Plaza is a DC fast-charging station run by Applegreen at 116 E New Jersey Turnpike in Ridgefield, NJ. It has 8 charging ports with CCS1 connectors and delivers up to 400 kw. Listed pricing is $0.58/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~90mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
8 ports · 400 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
$0.58/kWh
Network listing: “$0.58 per kWh”
A 10% to 80% session (about 54 kWh) costs roughly $31.26 before taxes and idle fees.
Location and access
- Address
- 116 E New Jersey Turnpike
Ridgefield, NJ 07657 - Coordinates
- 40.82271, -74.03108
- Finding the chargers
- NJ Turnpike Bidirectional (Mile Marker 116) (Ridgefield Borough, Bergen County)
- Hours
- 24/7
- Phone
- 888-557-7101
- Network
- Applegreen
- On site
- RestroomsFood / RestaurantsConvenience Store24/7 Access
Questions drivers ask
How fast is Vince Lombardi Service Plaza?
It delivers up to 400 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Vince Lombardi Service Plaza?
The listed rate is $0.58/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $31 before taxes and idle fees.
What plugs does Vince Lombardi Service Plaza have?
8 × CCS1 (Combined Charging System) up to 400 kW.
Is Vince Lombardi Service Plaza open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 384165. Last confirmed by the network on Mar 12, 2026; opened Jan 31, 2025.