Zachary Playfield
4355 Zachary Lane N, Plymouth, MN 55442
- Max power
- 24 kW
- DC fast
- Charging ports
- 5
- CCS1, J1772
- Price
- Price not listed
- Per network listing
- Hours
- Not listed
- Check before you go
Zachary Playfield is a DC fast-charging station run by Dirt Road at 4355 Zachary Lane N in Plymouth, MN. It has 5 charging ports with CCS1 and J1772 connectors and delivers up to 24 kw. Pricing is set by the network app.
How long will charging take?
10% to 80%, 77 kWh battery
~159min
Range added in 15 minutes
~17mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
2 ports · 24 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
J1772
4 ports · 7 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Dirt Road app shows the live rate before you start.
Location and access
- Address
- 4355 Zachary Lane N
Plymouth, MN 55442 - Coordinates
- 45.03513, -93.42185
- Hours
- Not listed
- Phone
- 888-401-3738
- Network
- Dirt Road
Questions drivers ask
How fast is Zachary Playfield?
It delivers up to 24 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 159 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Zachary Playfield?
Dirt Road has not published a fixed price for this site. Rates are shown in the Dirt Road app or on the charger screen before you start a session.
What plugs does Zachary Playfield have?
2 × CCS1 (Combined Charging System) up to 24 kW; 4 × J1772 (Type 1) up to 7 kW.
Is Zachary Playfield open 24/7?
Hours are not listed. Access may follow the host location's opening hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 457345. Last confirmed by the network on Oct 11, 2026; opened Apr 9, 2026.