Steele Waseca Cooperative Electric
2411 W Bridge St, Owatonna, MN 55060
- Max power
- 39.8 kW
- DC fast
- Charging ports
- 4
- CCS1
- Price
- Price not listed
- Per network listing
- Hours
- Not listed
- Check before you go
Steele Waseca Cooperative Electric is a DC fast-charging station run by Red E at 2411 W Bridge St in Owatonna, MN. It has 4 charging ports with CCS1 connectors and delivers up to 39.8 kw. Pricing is set by the network app.
How long will charging take?
10% to 80%, 77 kWh battery
~96min
Range added in 15 minutes
~28mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
4 ports · 40 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Price not listed
Prices can vary by time of day and membership. The Red E app shows the live rate before you start.
Location and access
- Address
- 2411 W Bridge St
Owatonna, MN 55060 - Coordinates
- 44.08336, -93.25806
- Hours
- Not listed
- Phone
- 313-262-6722
- Network
- Red E
Questions drivers ask
How fast is Steele Waseca Cooperative Electric?
It delivers up to 40 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 96 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Steele Waseca Cooperative Electric?
Red E has not published a fixed price for this site. Rates are shown in the Red E app or on the charger screen before you start a session.
What plugs does Steele Waseca Cooperative Electric have?
4 × CCS1 (Combined Charging System) up to 40 kW.
Is Steele Waseca Cooperative Electric open 24/7?
Hours are not listed. Access may follow the host location's opening hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 320150. Last confirmed by the network on Oct 11, 2026; opened Nov 16, 2023.