Skip to content
ChargePulse
DC fast Nayax Energy

Moose Lake Water&Light

255 Arrowhead Ln, Moose Lake, MN 55767

Max power
50 kW
DC fast
Charging ports
2
CCS1
Price
$0.49/kWh
Per network listing
Hours
24/7
Open all day

Moose Lake Water&Light is a DC fast-charging station run by Nayax Energy at 255 Arrowhead Ln in Moose Lake, MN. It has 2 charging ports with CCS1 connectors and delivers up to 50 kw. Listed pricing is $0.49/kWh, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~76min

Range added in 15 minutes

~35mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 50 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

$0.49/kWh

Network listing: “$0.49 per kWh +$1 connection”

A 10% to 80% session (about 54 kWh) costs roughly $26.41 before taxes and idle fees.

Location and access

Address
255 Arrowhead Ln
Moose Lake, MN 55767
Coordinates
46.45271, -92.76350
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is Moose Lake Water&Light?

It delivers up to 50 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Moose Lake Water&Light?

The listed rate is $0.49/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $26 before taxes and idle fees.

What plugs does Moose Lake Water&Light have?

2 × CCS1 (Combined Charging System) up to 50 kW.

Is Moose Lake Water&Light open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 448694. Last confirmed by the network on Jan 13, 2026; opened Aug 1, 2025.