Skip to content
ChargePulse
High-power DC Evrange Temporarily unavailable

Crow River Winery - Huchinson, MN

14848 MN-7, Huchinson, MN 55350

Max power
180 kW
High-power DC
Charging ports
2
CCS1
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Crow River Winery - Huchinson, MN is a DC fast-charging station run by Evrange at 14848 MN-7 in Huchinson, MN. It has 2 charging ports with CCS1 connectors and delivers up to 180 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~90mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 180 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The Evrange app shows the live rate before you start.

Location and access

Address
14848 MN-7
Huchinson, MN 55350
Coordinates
44.89307, -94.29273
Hours
Not listed
Network
Evrange

Questions drivers ask

How fast is Crow River Winery - Huchinson, MN?

It delivers up to 180 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Crow River Winery - Huchinson, MN?

Evrange has not published a fixed price for this site. Rates are shown in the Evrange app or on the charger screen before you start a session.

What plugs does Crow River Winery - Huchinson, MN have?

2 × CCS1 (Combined Charging System) up to 180 kW.

Is Crow River Winery - Huchinson, MN open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 417584. Last confirmed by the network on Oct 11, 2026; opened Aug 6, 2025.