Skip to content
ChargePulse
DC fast Red E

G and R Machine Tool

20410 Superior Rd, Taylor, MI 48180

Max power
60 kW
DC fast
Charging ports
2
CCS1
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

G and R Machine Tool is a DC fast-charging station run by Red E at 20410 Superior Rd in Taylor, MI. It has 2 charging ports with CCS1 connectors and delivers up to 60 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~63min

Range added in 15 minutes

~42mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 60 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The Red E app shows the live rate before you start.

Location and access

Address
20410 Superior Rd
Taylor, MI 48180
Coordinates
42.20637, -83.23285
Hours
Not listed
Network
Red E

Questions drivers ask

How fast is G and R Machine Tool?

It delivers up to 60 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 63 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at G and R Machine Tool?

Red E has not published a fixed price for this site. Rates are shown in the Red E app or on the charger screen before you start a session.

What plugs does G and R Machine Tool have?

2 × CCS1 (Combined Charging System) up to 60 kW.

Is G and R Machine Tool open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 400456. Last confirmed by the network on Oct 11, 2026; opened Jan 27, 2025.