Stevensville Amoco
4609 Red Arrow Hwy, Stevensville, MI 49127
- Max power
- 319.7 kW
- Ultra-fast DC
- Charging ports
- 4
- CCS1
- Price
- Price not listed
- Per network listing
- Hours
- Not listed
- Check before you go
Stevensville Amoco is a DC fast-charging station run by Red E at 4609 Red Arrow Hwy in Stevensville, MI. It has 4 charging ports with CCS1 connectors and delivers up to 319.7 kw. Pricing is set by the network app.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~90mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
4 ports · 320 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Price not listed
Prices can vary by time of day and membership. The Red E app shows the live rate before you start.
Location and access
- Address
- 4609 Red Arrow Hwy
Stevensville, MI 49127 - Coordinates
- 42.03401, -86.51395
- Hours
- Not listed
- Phone
- 313-262-6722
- Network
- Red E
Questions drivers ask
How fast is Stevensville Amoco?
It delivers up to 320 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Stevensville Amoco?
Red E has not published a fixed price for this site. Rates are shown in the Red E app or on the charger screen before you start a session.
What plugs does Stevensville Amoco have?
4 × CCS1 (Combined Charging System) up to 320 kW.
Is Stevensville Amoco open 24/7?
Hours are not listed. Access may follow the host location's opening hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 314471. Last confirmed by the network on Oct 11, 2026; opened Aug 25, 2023.