Berger Chevrolet
2525 28th St SE, Grand Rapids, MI 49512
- Max power
- 25 kW
- DC fast
- Charging ports
- 1
- CCS1
- Price
- Free
- No charging fee listed
- Hours
- See hours
- Dealership business hours
Berger Chevrolet is a DC fast-charging station run by Independent at 2525 28th St SE in Grand Rapids, MI. It has 1 charging port with CCS1 connectors and delivers up to 25 kw. Charging is free, and the site is open Dealership business hours.
How long will charging take?
10% to 80%, 77 kWh battery
~152min
Range added in 15 minutes
~18mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
1 port · 25 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
Free
Network listing: “Free”
Location and access
- Address
- 2525 28th St SE
Grand Rapids, MI 49512 - Coordinates
- 42.91328, -85.60565
- Hours
- Dealership business hours
- Phone
- 616-949-5200
- On site
- Restrooms
Questions drivers ask
How fast is Berger Chevrolet?
It delivers up to 25 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 152 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Berger Chevrolet?
Charging is listed as free. Parking fees or time limits may still apply.
What plugs does Berger Chevrolet have?
1 × CCS1 (Combined Charging System) up to 25 kW.
Is Berger Chevrolet open 24/7?
Listed hours: Dealership business hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 168050. Last confirmed by the network on Jul 15, 2026; opened Oct 26, 2020.