Ford Vehicle Performance + Electrification Center
8500 Enterprise Dr, Allen Park, MI 48101
- Max power
- 240 kW
- High-power DC
- Charging ports
- 4
- CCS1, NACS
- Price
- Price not listed
- Per network listing
- Hours
- 24/7
- Open all day
Ford Vehicle Performance + Electrification Center is a DC fast-charging station run by Ford Charge at 8500 Enterprise Dr in Allen Park, MI. It has 4 charging ports with CCS1 and NACS connectors and delivers up to 240 kw. Pricing is set by the network app, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~30min
Range added in 15 minutes
~90mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
3 ports · 240 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
NACS
1 port · 120 kW
DC fast
The North American Charging Standard, Tesla's plug, now adopted by most automakers.
Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.
Pricing
Price not listed
Prices can vary by time of day and membership. The Ford Charge app shows the live rate before you start.
Location and access
- Address
- 8500 Enterprise Dr
Allen Park, MI 48101 - Coordinates
- 42.26402, -83.21283
- Hours
- 24/7
- Phone
- 888-357-1009
- Network
- Ford Charge
- On site
- 24/7 Access
Questions drivers ask
How fast is Ford Vehicle Performance + Electrification Center?
It delivers up to 240 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Ford Vehicle Performance + Electrification Center?
Ford Charge has not published a fixed price for this site. Rates are shown in the Ford Charge app or on the charger screen before you start a session.
What plugs does Ford Vehicle Performance + Electrification Center have?
3 × CCS1 (Combined Charging System) up to 240 kW; 1 × NACS (SAE J3400) up to 120 kW.
Is Ford Vehicle Performance + Electrification Center open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 358351. Last confirmed by the network on Oct 11, 2026; opened Aug 2, 2023.