Skip to content
ChargePulse
DC fast Swtch

EVsmart - BGE - Sykesville City Hall

7547 Main St, Sykesville, MD 21784

Max power
50 kW
DC fast
Charging ports
4
CCS1, CHAdeMO, J1772
Price
Free
No charging fee listed
Hours
24/7
Open all day

EVsmart - BGE - Sykesville City Hall is a DC fast-charging station run by Swtch at 7547 Main St in Sykesville, MD. It has 4 charging ports with CCS1, CHAdeMO and J1772 connectors and delivers up to 50 kw. Charging is free, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~76min

Range added in 15 minutes

~35mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 50 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

1 port · 50 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

2 ports · 7 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Free

Network listing: “Free”

Location and access

Address
7547 Main St
Sykesville, MD 21784
Coordinates
39.36621, -76.96840
Hours
24/7
Network
Swtch
On site
Outdoor Space24/7 Access

Questions drivers ask

How fast is EVsmart - BGE - Sykesville City Hall?

It delivers up to 50 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at EVsmart - BGE - Sykesville City Hall?

Charging is listed as free. Parking fees or time limits may still apply.

What plugs does EVsmart - BGE - Sykesville City Hall have?

1 × CHAdeMO up to 50 kW; 1 × CCS1 (Combined Charging System) up to 50 kW; 2 × J1772 (Type 1) up to 7 kW.

Is EVsmart - BGE - Sykesville City Hall open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 189771. Last confirmed by the network on Jan 13, 2026; opened Jun 3, 2025.