Skip to content
ChargePulse
DC fast Independent

City of Baltimore - Garage

101 W Dickman St, Baltimore, MD 21230

Max power
50 kW
DC fast
Charging ports
1
CCS1, CHAdeMO
Price
Free
No charging fee listed
Hours
See hours
Garage business hours

City of Baltimore - Garage is a DC fast-charging station run by Independent at 101 W Dickman St in Baltimore, MD. It has 1 charging port with CCS1 and CHAdeMO connectors and delivers up to 50 kw. Charging is free, and the site is open Garage business hours.

How long will charging take?

10% to 80%, 77 kWh battery

~76min

Range added in 15 minutes

~35mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 50 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

1 port · 50 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Free

Network listing: “Free”

Location and access

Address
101 W Dickman St
Baltimore, MD 21230
Coordinates
39.26257, -76.61626
Hours
Garage business hours
On site
Covered Parking

Questions drivers ask

How fast is City of Baltimore - Garage?

It delivers up to 50 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at City of Baltimore - Garage?

Charging is listed as free. Parking fees or time limits may still apply.

What plugs does City of Baltimore - Garage have?

1 × CHAdeMO up to 50 kW; 1 × CCS1 (Combined Charging System) up to 50 kW.

Is City of Baltimore - Garage open 24/7?

Listed hours: Garage business hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 82220. Last confirmed by the network on Nov 6, 2024; opened Mar 31, 2017.