University of Southern Maine
62 School St, Gorham, ME 04038
- Max power
- 150 kW
- High-power DC
- Charging ports
- 2
- CCS1, NACS
- Price
- $0.48/kWh
- Per network listing
- Hours
- 24/7
- Open all day
University of Southern Maine is a DC fast-charging station run by Jule at 62 School St in Gorham, ME. It has 2 charging ports with CCS1 and NACS connectors and delivers up to 150 kw. Listed pricing is $0.48/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~35min
Range added in 15 minutes
~77mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
2 ports · 150 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
NACS
2 ports · 150 kW
DC fast
The North American Charging Standard, Tesla's plug, now adopted by most automakers.
Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.
Pricing
$0.48/kWh
Network listing: “$0.48 per kWh”
A 10% to 80% session (about 54 kWh) costs roughly $25.87 before taxes and idle fees.
Location and access
- Address
- 62 School St
Gorham, ME 04038 - Coordinates
- 43.68161, -70.44439
- Hours
- 24/7
- Phone
- 855-567-5853
- Network
- Jule
- On site
- 24/7 Access
Questions drivers ask
How fast is University of Southern Maine?
It delivers up to 150 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 35 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at University of Southern Maine?
The listed rate is $0.48/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $26 before taxes and idle fees.
What plugs does University of Southern Maine have?
2 × CCS1 (Combined Charging System) up to 150 kW; 2 × NACS (SAE J3400) up to 150 kW.
Is University of Southern Maine open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 449667. Last confirmed by the network on Feb 13, 2026; opened Jan 16, 2026.