Skip to content
ChargePulse
DC fast ChargePoint

Kerry Hyun Flor DC 2

6149 Hopeful Church Rd, Florence, KY 41042

Max power
62.5 kW
DC fast
Charging ports
1
CCS1, CHAdeMO
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Kerry Hyun Flor DC 2 is a DC fast-charging station run by ChargePoint at 6149 Hopeful Church Rd in Florence, KY. It has 1 charging port with CCS1 and CHAdeMO connectors and delivers up to 62.5 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~61min

Range added in 15 minutes

~44mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 63 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

1 port · 62 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
6149 Hopeful Church Rd
Florence, KY 41042
Coordinates
39.00227, -84.65575
Finding the chargers
Front of Building
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is Kerry Hyun Flor DC 2?

It delivers up to 63 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 61 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Kerry Hyun Flor DC 2?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does Kerry Hyun Flor DC 2 have?

1 × CHAdeMO up to 63 kW; 1 × CCS1 (Combined Charging System) up to 62 kW.

Is Kerry Hyun Flor DC 2 open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 308085. Last confirmed by the network on Oct 11, 2026; opened Aug 30, 2023.