Chargelab at 1121 E 23rd St.
1121 E 23rd St, Lawrence, KS 66046
- Max power
- 11.5 kW
- DC fast
- Charging ports
- 2
- J1772, NACS
- Price
- Price not listed
- Per network listing
- Hours
- Not listed
- Check before you go
Chargelab at 1121 E 23rd St. is a DC fast-charging station run by Chargelab at 1121 E 23rd St in Lawrence, KS. It has 2 charging ports with J1772 and NACS connectors and delivers up to 11.5 kw. Pricing is set by the network app.
How long will charging take?
10% to 80%, 77 kWh battery
~331min
Range added in 15 minutes
~8mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
NACS
1 port · 12 kW
DC fast
The North American Charging Standard, Tesla's plug, now adopted by most automakers.
Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.
J1772
1 port · 12 kW
AC
The universal Level 2 AC plug in North America.
Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.
Pricing
Price not listed
Prices can vary by time of day and membership. The Chargelab app shows the live rate before you start.
Location and access
- Address
- 1121 E 23rd St
Lawrence, KS 66046 - Coordinates
- 38.94220, -95.21958
- Hours
- Not listed
- Phone
- 800-636-0986
- Network
- Chargelab
Questions drivers ask
How fast is Chargelab at 1121 E 23rd St.?
It delivers up to 12 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 331 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Chargelab at 1121 E 23rd St.?
Chargelab has not published a fixed price for this site. Rates are shown in the Chargelab app or on the charger screen before you start a session.
What plugs does Chargelab at 1121 E 23rd St. have?
1 × NACS (SAE J3400) up to 12 kW; 1 × J1772 (Type 1) up to 12 kW.
Is Chargelab at 1121 E 23rd St. open 24/7?
Hours are not listed. Access may follow the host location's opening hours.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 455660. Last confirmed by the network on Oct 11, 2026; opened Mar 18, 2026.