Skip to content
ChargePulse
High-power DC Chargelab

Chargelab at 1019 N Chestnut St

1019 N Chestnut St, Avoca, IA 51521

Max power
150 kW
High-power DC
Charging ports
4
CCS1, CHAdeMO
Price
Price not listed
Per network listing
Hours
Not listed
Check before you go

Chargelab at 1019 N Chestnut St is a DC fast-charging station run by Chargelab at 1019 N Chestnut St in Avoca, IA. It has 4 charging ports with CCS1 and CHAdeMO connectors and delivers up to 150 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~35min

Range added in 15 minutes

~77mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

2 ports · 150 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

2 ports · 150 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The Chargelab app shows the live rate before you start.

Location and access

Address
1019 N Chestnut St
Avoca, IA 51521
Coordinates
41.48560, -95.33590
Hours
Not listed
Network
Chargelab

Questions drivers ask

How fast is Chargelab at 1019 N Chestnut St?

It delivers up to 150 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 35 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Chargelab at 1019 N Chestnut St?

Chargelab has not published a fixed price for this site. Rates are shown in the Chargelab app or on the charger screen before you start a session.

What plugs does Chargelab at 1019 N Chestnut St have?

2 × CHAdeMO up to 150 kW; 2 × CCS1 (Combined Charging System) up to 150 kW.

Is Chargelab at 1019 N Chestnut St open 24/7?

Hours are not listed. Access may follow the host location's opening hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 163833. Last confirmed by the network on Oct 11, 2026; opened Jul 3, 2020.