Skip to content
ChargePulse
High-power DC In Charge

NIPSCO/GOEVIN - Merrillville

611 US-30, Merrillville, IN 46410

Max power
150 kW
High-power DC
Charging ports
4
CCS1, NACS
Price
$0.48/kWh
Per network listing
Hours
24/7
Open all day

NIPSCO/GOEVIN - Merrillville is a DC fast-charging station run by In Charge at 611 US-30 in Merrillville, IN. It has 4 charging ports with CCS1 and NACS connectors and delivers up to 150 kw. Listed pricing is $0.48/kWh, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~35min

Range added in 15 minutes

~77mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

4 ports · 150 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NACS

4 ports · 150 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

Pricing

$0.48/kWh

Network listing: “$0.48 per kWh”

A 10% to 80% session (about 54 kWh) costs roughly $25.87 before taxes and idle fees.

Location and access

Address
611 US-30
Merrillville, IN 46410
Coordinates
41.46794, -87.34533
Hours
24/7
Highway
US-30
Network
In Charge
On site
GroceryRestrooms24/7 Access

Questions drivers ask

How fast is NIPSCO/GOEVIN - Merrillville?

It delivers up to 150 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 35 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at NIPSCO/GOEVIN - Merrillville?

The listed rate is $0.48/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $26 before taxes and idle fees.

What plugs does NIPSCO/GOEVIN - Merrillville have?

4 × CCS1 (Combined Charging System) up to 150 kW; 4 × NACS (SAE J3400) up to 150 kW.

Is NIPSCO/GOEVIN - Merrillville open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 470669. Last confirmed by the network on Sep 29, 2026; opened Sep 11, 2026.