Skip to content
ChargePulse
High-power DC ChargePoint

GCDJ Power Link 1

7255 Grand Ave, Gurnee, IL 60031

Max power
200 kW
High-power DC
Charging ports
2
CCS1
Price
Price not listed
Per network listing
Hours
See hours
Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm

GCDJ Power Link 1 is a DC fast-charging station run by ChargePoint at 7255 Grand Ave in Gurnee, IL. It has 2 charging ports with CCS1 connectors and delivers up to 200 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~30min

Range added in 15 minutes

~90mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 200 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
7255 Grand Ave
Gurnee, IL 60031
Coordinates
42.38500, -87.98367
Hours
Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm

Questions drivers ask

How fast is GCDJ Power Link 1?

It delivers up to 200 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 30 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at GCDJ Power Link 1?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does GCDJ Power Link 1 have?

2 × CCS1 (Combined Charging System) up to 200 kW.

Is GCDJ Power Link 1 open 24/7?

Listed hours: Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 374027. Last confirmed by the network on Oct 10, 2026; opened Dec 18, 2024.