Skip to content
ChargePulse
DC fast In Charge

Sheridan Nissan

114 S Dupont Hwy, New Castle, DE 19720

Max power
50 kW
DC fast
Charging ports
1
CCS1, CHAdeMO
Price
$0.30/kWh
Per network listing
Hours
See hours
Dealership business hours

Sheridan Nissan is a DC fast-charging station run by In Charge at 114 S Dupont Hwy in New Castle, DE. It has 1 charging port with CCS1 and CHAdeMO connectors and delivers up to 50 kw. Listed pricing is $0.30/kWh, and the site is open Dealership business hours.

How long will charging take?

10% to 80%, 77 kWh battery

~76min

Range added in 15 minutes

~35mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

1 port · 50 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

1 port · 50 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

$0.30/kWh

Network listing: “$0.30 per kWh”

A 10% to 80% session (about 54 kWh) costs roughly $16.17 before taxes and idle fees.

Location and access

Address
114 S Dupont Hwy
New Castle, DE 19720
Coordinates
39.66363, -75.60480
Hours
Dealership business hours
Network
In Charge
On site
Restrooms

Questions drivers ask

How fast is Sheridan Nissan?

It delivers up to 50 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 76 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Sheridan Nissan?

The listed rate is $0.30/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $16 before taxes and idle fees.

What plugs does Sheridan Nissan have?

1 × CHAdeMO up to 50 kW; 1 × CCS1 (Combined Charging System) up to 50 kW.

Is Sheridan Nissan open 24/7?

Listed hours: Dealership business hours.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 449389. Last confirmed by the network on Jan 13, 2026; opened Jun 5, 2012.