Skip to content
ChargePulse
High-power DC Applegreen

Applegreen Electric I-95 Madison SB Service Plaza

1 South St, Madison, CT 06443

Max power
150 kW
High-power DC
Charging ports
4
CCS1, CHAdeMO
Price
$0.64/kWh
Per network listing
Hours
24/7
Open all day

Applegreen Electric I-95 Madison SB Service Plaza is a DC fast-charging station run by Applegreen at 1 South St in Madison, CT. It has 4 charging ports with CCS1 and CHAdeMO connectors and delivers up to 150 kw. Listed pricing is $0.64/kWh, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~35min

Range added in 15 minutes

~77mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CHAdeMO

4 ports · 50 kW

DC fast

An older Japanese DC standard, being phased out in North America; usually capped near 50 kW.

Works with: Nissan Leaf (all years) and Mitsubishi Outlander PHEV. Few new vehicles use it.

CCS1

4 ports · 150 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

$0.64/kWh

Network listing: “$0.64 per kWh”

A 10% to 80% session (about 54 kWh) costs roughly $34.50 before taxes and idle fees.

Location and access

Address
1 South St
Madison, CT 06443
Coordinates
41.29154, -72.57950
Hours
24/7
Highway
I-95
Network
Applegreen
On site
Restrooms24/7 Access

Questions drivers ask

How fast is Applegreen Electric I-95 Madison SB Service Plaza?

It delivers up to 150 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 35 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Applegreen Electric I-95 Madison SB Service Plaza?

The listed rate is $0.64/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $34 before taxes and idle fees.

What plugs does Applegreen Electric I-95 Madison SB Service Plaza have?

4 × CHAdeMO up to 50 kW; 4 × CCS1 (Combined Charging System) up to 150 kW.

Is Applegreen Electric I-95 Madison SB Service Plaza open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 223850. Last confirmed by the network on Mar 12, 2026; opened May 27, 2022.