Skip to content
ChargePulse
DC fast ChargePoint

ChargePoint at 365 E Main ST CPE250 2

365 East Main Street, Branford, CT 06405

Max power
125 kW
DC fast
Charging ports
1
CCS1, NACS
Price
Price not listed
Per network listing
Hours
See hours
Mon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm

ChargePoint at 365 E Main ST CPE250 2 is a DC fast-charging station run by ChargePoint at 365 East Main Street in Branford, CT. It has 1 charging port with CCS1 and NACS connectors and delivers up to 125 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~42min

Range added in 15 minutes

~64mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

1 port · 125 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

NACS

1 port · 125 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
365 East Main Street
Branford, CT 06405
Coordinates
41.29451, -72.78256
Hours
Mon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm

Questions drivers ask

How fast is ChargePoint at 365 E Main ST CPE250 2?

It delivers up to 125 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 42 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at ChargePoint at 365 E Main ST CPE250 2?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does ChargePoint at 365 E Main ST CPE250 2 have?

1 × CCS1 (Combined Charging System) up to 125 kW; 1 × NACS (SAE J3400) up to 125 kW.

Is ChargePoint at 365 E Main ST CPE250 2 open 24/7?

Listed hours: Mon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 332000. Last confirmed by the network on Oct 10, 2026; opened Apr 11, 2024.