Skip to content
ChargePulse
DC fast ChargePoint Temporarily unavailable

Larimercounty 200OAK-1

200 W Oak St, Fort Collins, CO 80521

Max power
119.6 kW
DC fast
Charging ports
2
CCS1
Price
Price not listed
Per network listing
Hours
See hours
Mon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-5:00am, 2:00pm-11:59pm; Sun: 12:00am-11:59pm

Larimercounty 200OAK-1 is a DC fast-charging station run by ChargePoint at 200 W Oak St in Fort Collins, CO. It has 2 charging ports with CCS1 connectors and delivers up to 119.6 kw. Pricing is set by the network app.

How long will charging take?

10% to 80%, 77 kWh battery

~44min

Range added in 15 minutes

~61mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 120 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
200 W Oak St
Fort Collins, CO 80521
Coordinates
40.58612, -105.07946
Finding the chargers
main parking lot
Hours
Mon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-5:00am, 2:00pm-11:59pm; Sun: 12:00am-11:59pm

Questions drivers ask

How fast is Larimercounty 200OAK-1?

It delivers up to 120 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 44 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Larimercounty 200OAK-1?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does Larimercounty 200OAK-1 have?

2 × CCS1 (Combined Charging System) up to 120 kW.

Is Larimercounty 200OAK-1 open 24/7?

Listed hours: Mon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-5:00am, 2:00pm-11:59pm; Sun: 12:00am-11:59pm.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 388037. Last confirmed by the network on Oct 10, 2026; opened Mar 19, 2025.