Loop at 2190 S Platte River Dr
2190 S Platte River Dr, Denver, CO 80223
- Max power
- 75 kW
- DC fast
- Charging ports
- 2
- CCS1
- Price
- $0.40/kWh
- Per network listing
- Hours
- 24/7
- Open all day
Loop at 2190 S Platte River Dr is a DC fast-charging station run by Loop at 2190 S Platte River Dr in Denver, CO. It has 2 charging ports with CCS1 connectors and delivers up to 75 kw. Listed pricing is $0.40/kWh, and the site is open 24 hours a day.
How long will charging take?
10% to 80%, 77 kWh battery
~70min
Range added in 15 minutes
~38mi
Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works
Connectors and compatibility
CCS1
2 ports · 75 kW
DC fast
The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.
Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.
Pricing
$0.40/kWh
Network listing: “$1 activation fee; $0.40 per kWh”
A 10% to 80% session (about 54 kWh) costs roughly $21.56 before taxes and idle fees.
Location and access
- Address
- 2190 S Platte River Dr
Denver, CO 80223 - Coordinates
- 39.67685, -104.99689
- Hours
- 24/7
- Phone
- 888-385-6671
- Network
- Loop
- On site
- 24/7 Access
Questions drivers ask
How fast is Loop at 2190 S Platte River Dr?
It delivers up to 75 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 70 minutes, though your car's own charging curve, battery temperature and shared power can change that.
How much does it cost to charge at Loop at 2190 S Platte River Dr?
The listed rate is $0.40/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $22 before taxes and idle fees.
What plugs does Loop at 2190 S Platte River Dr have?
2 × CCS1 (Combined Charging System) up to 75 kW.
Is Loop at 2190 S Platte River Dr open 24/7?
Yes, the network lists it as open 24 hours a day.
Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 463178. Last confirmed by the network on Jul 15, 2026; opened Apr 29, 2026.