Skip to content
ChargePulse
DC fast Evgateway

Shortline GMC

1301 Havana St, Aurora, CO 80012

Max power
120 kW
DC fast
Charging ports
7
CCS1, J1772
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Shortline GMC is a DC fast-charging station run by Evgateway at 1301 Havana St in Aurora, CO. It has 7 charging ports with CCS1 and J1772 connectors and delivers up to 120 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~43min

Range added in 15 minutes

~61mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

2 ports · 120 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

5 ports · 19 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The Evgateway app shows the live rate before you start.

Location and access

Address
1301 Havana St
Aurora, CO 80012
Coordinates
39.69310, -104.86681
Hours
24/7
Network
Evgateway
On site
24/7 Access

Questions drivers ask

How fast is Shortline GMC?

It delivers up to 120 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 43 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Shortline GMC?

Evgateway has not published a fixed price for this site. Rates are shown in the Evgateway app or on the charger screen before you start a session.

What plugs does Shortline GMC have?

2 × CCS1 (Combined Charging System) up to 120 kW; 5 × J1772 (Type 1) up to 19 kW.

Is Shortline GMC open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 254261. Last confirmed by the network on Oct 11, 2026; opened Aug 10, 2022.