Skip to content
ChargePulse
DC fast ChargePoint

Castelion 1ST Evcs Left

19951 Mariner Ave, Torrance, CA 90503

Max power
9.6 kW
DC fast
Charging ports
2
J1772, NACS
Price
Price not listed
Per network listing
Hours
24/7
Open all day

Castelion 1ST Evcs Left is a DC fast-charging station run by ChargePoint at 19951 Mariner Ave in Torrance, CA. It has 2 charging ports with J1772 and NACS connectors and delivers up to 9.6 kw. Pricing is set by the network app, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~396min

Range added in 15 minutes

~7mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

NACS

2 ports · 10 kW

DC fast

The North American Charging Standard, Tesla's plug, now adopted by most automakers.

Works with: Tesla natively. Ford, GM, Rivian, Hyundai, Kia, Nissan, Mercedes, Volvo and others with a NACS port or an approved adapter, where the site is open to non-Teslas.

J1772

2 ports · 10 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

Price not listed

Prices can vary by time of day and membership. The ChargePoint app shows the live rate before you start.

Location and access

Address
19951 Mariner Ave
Torrance, CA 90503
Coordinates
33.85086, -118.35089
Finding the chargers
Parking in back
Hours
24/7
On site
24/7 Access

Questions drivers ask

How fast is Castelion 1ST Evcs Left?

It delivers up to 10 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 396 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Castelion 1ST Evcs Left?

ChargePoint has not published a fixed price for this site. Rates are shown in the ChargePoint app or on the charger screen before you start a session.

What plugs does Castelion 1ST Evcs Left have?

2 × NACS (SAE J3400) up to 10 kW; 2 × J1772 (Type 1) up to 10 kW.

Is Castelion 1ST Evcs Left open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 463668. Last confirmed by the network on Oct 10, 2026; opened Jul 16, 2026.