Skip to content
ChargePulse
DC fast Evolv Charging

Grosvenor Airport Associates

380 S Airport Blvd, South San Francisco, CA 94080

Max power
100 kW
DC fast
Charging ports
22
CCS1, J1772
Price
$0.75/kWh
Per network listing
Hours
24/7
Open all day

Grosvenor Airport Associates is a DC fast-charging station run by Evolv Charging at 380 S Airport Blvd in South San Francisco, CA. It has 22 charging ports with CCS1 and J1772 connectors and delivers up to 100 kw. Listed pricing is $0.75/kWh, and the site is open 24 hours a day.

How long will charging take?

10% to 80%, 77 kWh battery

~52min

Range added in 15 minutes

~51mi

Estimates for a typical long-range EV. Real times depend on your car's maximum charging rate, battery temperature, state of charge and whether power is shared between neighbouring stalls. How charging speed works

Connectors and compatibility

CCS1

12 ports · 100 kW

DC fast

The DC fast-charging plug used by most non-Tesla EVs sold in North America before 2025.

Works with: Ford Mustang Mach-E, Chevrolet Bolt and Equinox EV, Hyundai Ioniq 5/6, Kia EV6/EV9, VW ID.4, BMW i4/iX, Rivian, Lucid and most other EVs. Teslas can use it with a CCS adapter.

J1772

10 ports · 19 kW

AC

The universal Level 2 AC plug in North America.

Works with: Every non-Tesla EV and plug-in hybrid. Teslas charge with the J1772 adapter that ships with the car.

Pricing

$0.75/kWh

Network listing: “$0.75 per kWh”

A 10% to 80% session (about 54 kWh) costs roughly $40.42 before taxes and idle fees.

Location and access

Address
380 S Airport Blvd
South San Francisco, CA 94080
Coordinates
37.64348, -122.40448
Hours
24/7
On site
LodgingRestrooms24/7 Access

Questions drivers ask

How fast is Grosvenor Airport Associates?

It delivers up to 100 kW. A typical 77 kWh EV charging from 10% to 80% here needs roughly 52 minutes, though your car's own charging curve, battery temperature and shared power can change that.

How much does it cost to charge at Grosvenor Airport Associates?

The listed rate is $0.75/kWh. Adding about 54 kWh (10% to 80% on a 77 kWh battery) would cost roughly $40 before taxes and idle fees.

What plugs does Grosvenor Airport Associates have?

12 × CCS1 (Combined Charging System) up to 100 kW; 10 × J1772 (Type 1) up to 19 kW.

Is Grosvenor Airport Associates open 24/7?

Yes, the network lists it as open 24 hours a day.

Source: U.S. Department of Energy Alternative Fuels Data Center (AFDC), station ID 470305. Last confirmed by the network on Oct 8, 2026; opened Jul 15, 2026.